How advanced access techniques are minimising disruption on critical restoration of grade 2 structure
I’m always keen to keep up to date with innovative infrastructure maintenance projects, and the recent Stockport Viaduct restoration by Networkrail caught my eye as a brilliant example of rope access in action.
I’ve pulled out the key points of the project which I think you’ll agree really shine a light on impressive benefits of the rope access solution:
Project quick facts:
- Historic structure from 1840
- Carries 400 trains daily across M60 motorway
- £1.1 million restoration project
- 11 million bricks across 26 arches
Why rope access made the difference:
- Pinpoint access to tricky structural elements
- Minimal disruption with strategic night-time work
- Precise assessment without massive scaffolding
- Comprehensive visual inspection
Challenges overcome:
- Targeted vegetation management
- Surface restoration and graffiti removal
- Detailed check of 185-year-old masonry
- Maintaining continuous rail network performance
Strategic wins:
- Shorter project timeline
- Dramatically reduced operational interruption
- Cost-effective approach
- Enhanced safety through specialised techniques
Well done to the team at Network Rail for their work on this project; it demonstrates why rope access is a game-changing solution for complex infrastructure maintenance.
Facing complex engineering challenges? Sutro Group offers tailored access and inspection solutions across Rope Access, Robotics, and UAV technologies. Our expert team develops precision solutions to minimise disruption and maximise efficiency.
Sutro Group – Enhancing safety and maximising efficiency through innovative solutions.
Contact us today:
0800 069 9395
info@sutrogroup.co.uk
Source: https://lnkd.in/eFU7vEGH
Discuss your inspection requirements today
For more information on wind turbine inspection services, contact us: 0800 069 9395
info@sutrogroup.co.uk