Sutro Group
Case Studies
Discover how our advanced methodologies and cutting-edge technology help clients maintain operational excellence and achieve significant cost savings. Each study provides insights into project challenges, our unique approaches, and the benefits delivered.
Explore our case studies to see why Sutro Group is a trusted partner in maintaining the integrity of critical infrastructure.
Sutro Group was commissioned by B&W Vølund to perform a range of inspection and maintenance services at the Margam Green Energy Plant in Port Talbot, Wales.
Services utilised:
- sUAS (small Unmanned Aerial Systems) technology
- Non-Destructive Testing (NDT)
- Visual Testing
- Asset Integrity NDT
- Flue Gas Stack Repair
- Confined Space Rescue
Sutro Group undertook a challenging project to perform Global Mechanical Integrity Safety Standard (GMISS) inspections on the W911 Cooling Towers in Wales.
Services utilised:
sUAS (small Unmanned Aerial Systems) technology
At Sutro Group, we are committed to delivering services that uphold the highest standards of safety and quality. Our recent project involved a comprehensive Ultrasonic Testing (UT) Thickness Stack Inspection.
Services utilised:
- Ultrasonic Testing (UT) Thickness Inspection
- Structural Integrity Assessment
- Non-Destructive Testing (NDT)
- Equipment Restoration
Sutro Group was engaged to conduct a comprehensive maintenance project on the structural steel components of a large industrial facility.
Services utilised:
- Rope Access
- MEWP (Mobile Elevating Work Platform) Operations
- Structural Steel Prep and Painting
- Confined Space Rescue